Plant data

Features

  • Location:  Rieti
  • Coord. UTM (Zone 33S):
    323,270 E – 4,697,880 N
  • Site area: 17.0 ha
  • Built-up areas: 39,500 m²
  • Period of activity: work in progress since 2010
  • Assignment: Design, supervision and safety of works
  • Amount of work performed:
    2,000,000.00 €

Activities performed

  • Mapping of all overground scattered waste (solid and liquid industrial origin): approximately 800 tonnes of hazardous waste and about 340 tonnes of non-hazardous waste
  • Characterization, remediation, transport and disposal of hazardous wastes considered to be highly critical for the environment: about 625 ton
  • Characterization, remediation and disposal of asbestos-containing materials
  • Disposal of carbon disulfide storage used in the productive activities of the factory site and reclamation and decommissioning of the tanks

Activities to be carried

  • Supplementary Characterization of the foundation soils of the buildings which have not yet investigated
  • Development of the final conceptual model of the site
  • Site-specific risk analysis
  • Operative remediation project

(S0015)

Plant description

The ex-SNIA Viscosa plant, in Rieti, was built in 1928 as an avant-garde center for the production of artificial fibers in viscose rayon, a yarn which was able to replace various types of fabric, such as silk and cotton, thanks to its versatility. Viscose rayon was largely used to produce both fabrics and knitwear. The factory, however, after various vicissitudes and after an irreversible crisis, ceased production in the early eighties, although some buildings remained active until the end of 2006.
After the cessation of the production some areas of the plant have been “made safe” for the part related to plant sections:

    • depletion of plant components from liquids used for the process,
    • disconnection of electrical and electronic parts,
    • interruption of the paths of transfer of liquids used for the process,
    • protection of the storage of hazardous materials, etc.

Part of the site has already been made safe and has been object of remediation for the return of the area to commercial or industrial uses. However, there are still scattered refuse of various kinds (scattered solids and liquids in tanks), as well as plant parts to be divested and dispose or recover. From 2010 to date all the operations necessary for the permanent safety have been carried out in order to avoid possible contaminations of the environmental matrices. In particular asbestos-containing materials were removed and disposed and storage of carbon disulfide (substance used in the production of viscose and highly flammable even at low temperatures) has been emptied, hardened and disposed. Waste disposal overground are still ongoing with the final steps and site-specific risk analysis will be developed, as well ad final remediation project.