FORSU and RUR treatment plant in Stand Alone configuration

Plant Data

Generali

  • Plant surface: 66750 m2
  • Period: 2018
  • Assignment: Progettazione definitiva

Technical data

Details and type Treatments:

FORSU and RUR mechanical-biological treatment

FORSU treatment section

  • Potential: 65,000 t / year
  • Working days: 350 g / year
  • Process duration: 90 days
  • Anaerobic digester: 2 from 1800 m3
  • Biocells for aerobic stabilization: 9 from 500 m3
  • Maturation platee: 4 from 2400 m3
  • Product compost: 21,200 t / year
  • Biomethane produced: 490 Sm3 / h 


RUR treatment section

  • Potential: 80,000 t / year
  • Working days: 350 g / year
  • Process duration stabilization of organic fraction: 38 days
  • Anaerobic biocells: 7 from 400 m3
  • Aerobic biocells: 4 from 400 m3
  • Post-treatments: pressing of plastic material in bales and shredding for CSS
  • Stabilized organic fraction produced: 19,200 t / year
  • Recoverable plastics: 21,300 t / year
  • Recoverable metals: 800 t / year
  • Product biogas: 430 Nm3 / h

ACCESSORIES PLANTS

Exhaust air treatment by scrubber and biofilter:

 

  • treated capacity: 360,000 m3 / h
  • Scrubber: n. 4
  • Biofilters: n. 2 of 1300 m2 and 500 m2


Wastewater treatment / percolates by ultrafiltration plant and multi-stage reverse osmosis:

  • Maximum treated capacity: 100 m3 / g
  • Permeate flow rate clarified: 85 m3 / g
  • Concentrate flow rate: 15 m3 / g

 

Photovoltaic system

  • Installed power: 1,000 kW
  • Electricity production: 2,235 MWh / year

 

Self-production of electrical energy for the stand-alone configuration: 10.075 MWh / year

Plant description

The project concerns the construction of a plant, in a stand-alone configuration, consisting of an anaerobic digestion section of the organic fraction deriving from the separate collection (FORSU) with production of bio-methane (energy recovery), quality compost (material recovery) and a mechanical-biological treatment section of residual urban waste (RUR) for the recovery of materials / by-products and energy for self-consumption of the plant . The plant has a maximum treatment capacity of 65,000 t / year for the FORSU treatment section and 80,000 t / year for the RUR treatment section.

The project proposal therefore envisages the conduct of waste management operations R3 – R4 – R13 – D8 – D13 – D15 as indicated in Annex B and C of the fourth part of Legislative Decree.

The activities that take place inside the plant can be divided as follows:

A. FORSU TREATMENT SECTION

  • Mechanical pre-treatments
  • Anaerobic digestion, biogas production, biomethane refining
  • Production of quality compost


B. ORGANIC MECHANICAL TREATMENT RUR

  • Mechanical separation treatments;
  • Anaerobic stabilization, biogas production, cogeneration
  • C.S.S. production


The organic treatment of FORSU produces a quantity of quality compost equal to about 21,000 t / year and biomethane production equal to about 490 Sm3 / h. Instead of the treatment of RUR we obtain a quantity of stabilized organic fraction (FOS) equal to about 19,000 t / year, of recyclable materials equal to about 22,000 t / year and a biogas production equal to about 430 Nm3 / h.